AC Charging at Home
Most home EV chargers provide AC charging. The vehicle's onboard charger determines how much AC power it can accept, so fitting a higher-rated wall charger does not necessarily increase the actual vehicle charging rate.
The practical home charging rate is set by the vehicle, charger and property together. Compare 7 kW, 11 kW and 22 kW AC charging, then confirm the installation scope before choosing a charger.
Installation cost
The final cost depends on the charger model, vehicle compatibility, single-phase or three-phase supply, cable route, switchboard capacity, protection equipment, parking location and any load-management or solar-charging requirements. A written quote should clearly state the charger model, charging capacity, cable route, electrical protection, installation inclusions, exclusions and any switchboard work. PDG Energy does not publish a universal installed price because these property-specific requirements can materially change the final scope.
Know what the charger can deliver
Home charging and public rapid charging use different equipment and are not directly comparable by the number printed on a charger.
Most home EV chargers provide AC charging. The vehicle's onboard charger determines how much AC power it can accept, so fitting a higher-rated wall charger does not necessarily increase the actual vehicle charging rate.
Public DC fast chargers work differently and may charge at much higher rates than a home charger. Their output, the vehicle battery condition and the vehicle's DC charging capability determine the public charging result.
Charging-time guide
Use this as a simple planning estimate, not a guaranteed result:
Actual time can vary because of the vehicle, battery charge level, charging losses, charger settings and household electrical capacity.
Quote factors
These factors help make quotes comparable. The applicable detail depends on your property and selected system.
Often considered for suitable single-phase homes. Actual charging speed depends on the vehicle, charger settings and final electrical supply.
Usually requires suitable three-phase supply and a vehicle that supports 11 kW AC charging.
Requires suitable three-phase infrastructure, available electrical capacity and a vehicle capable of accepting 22 kW AC charging.
The charger nameplate is not a promise of the vehicle charging rate. The onboard charger, supply, household load and settings all affect what the vehicle receives.
Make the charger work with the property
The final design should match the way the vehicle is parked, charged and used, not only its connector or the charger nameplate.
Yes. Scheduled overnight charging can suit a regular charging window, while solar-surplus charging can respond to generation that remains after household loads. When household demand increases or solar output falls, the available solar charging rate can change. Charger settings, solar monitoring and any battery plan need to be considered together.
Not every property needs one. Available capacity, protection, cable route, phase arrangement and the load assessment must be checked. The review also considers existing solar, battery storage, air conditioning, cooking and other major loads so the charger is integrated safely into the property.
The written scope identifies charger mounting, a dedicated circuit, cable route, electrical protection, testing and commissioning. App setup or solar-aware configuration is included where relevant to the selected charger and agreed installation scope. Any switchboard work, exclusions and site conditions should be stated clearly.
Send the vehicle make and model, parking location, charger preference, switchboard photos, solar and battery details, and the charging behaviour you want. This allows PDG Energy to assess the supply, cable route, electrical protection, load management and final installed scope.
For a property-specific assessment and written scope, explore EV charger installation in Adelaide.
Guide FAQ
For a confirmed scope, move from this guide to the relevant core installation service.
It may be, particularly where the vehicle can charge during a regular overnight window and the property has suitable single-phase supply. The vehicle battery, onboard charger and driving pattern should be considered before choosing a rate.
No. A vehicle only accepts the AC rate supported by its onboard charger. A 22 kW charger also needs suitable three-phase infrastructure and available electrical capacity.
Yes, a suitable single-phase installation can support an EV charger. The practical charging rate and installation scope depend on the property, switchboard, cable route, vehicle and load assessment.
Yes, with a compatible solar-aware charging approach. Solar-surplus charging responds to available generation after household loads, so the charging rate can vary through the day.
Not every property does. Available capacity, protection, cable route, phase arrangement and the load assessment determine whether changes are needed.
Often, subject to the selected charger rating, mounting location, cable route, weather exposure, access and final electrical design.
The installation time depends on the final scope. Charger location, cable route, switchboard work, supply arrangement and any required approvals are confirmed before scheduling.
Yes, it can be planned as a future upgrade. The charger, existing solar, battery path and household load should be reviewed together so the final design remains practical.
We will assess the site, confirm the equipment path and document the actual installation scope.